PROJECT | MATERIAL | QUANTITY | YEAR |
---|---|---|---|
Nothern Delta Transportation Development Project – NDTDP (WB6) | HOCK GX 200/200 | 125.000 | 2014 |
The trial project for the working plant of consolidated | ARITEX TRG 16 | 2.150 | 03/2013 |
The Base Layer reinforcement for the main road of waste water channel in Dinh Vu IDZ | ARITEX TRG 16 | 3.500 | 11/2013 |
Inter – Connection Access Road to Phu My Ports | HOCK GX 100/100 | 78.000 185.000 | 2012-2014 |
Nui Phao Mining project – phase I | HOCK GX 100/100 | 43.000 | 2012 |
Duyen Hai 1 thermal power plant project | TRG 15 HOCK GX 400/50 | 80.000 31.000 | 2014-2015 |
Renovate and upgrade Highway 10 Ninh Phuc – Cau Dien Ho, Ninh Binh Province (Geotextile reinforced glass) | TRG 100FG | 19.800 | 2015 |
Internal roads – Nghi Son oil refinery in Thanh Hoa (Glass grid) | TRG 100FG | 2.000 | 2015 |