PROJECT | TYPE | QUANTITY | YEAR |
---|---|---|---|
Northern Delta Transportation Development Project (stage 2) | (2x6x0.3)m (2x5x0.5)m |
18.000 8.000 |
2013 – 2015 |
Thanh Doan Peninsula Landslide Prevention Project (stage 2) | (2x6x0.3)m | 1.500 | 2015 |
TL – 725 Project, Di Linh – Lam Dong | (2x1x1)m (1.5x1x1)m |
2.740 | 2015 |
Navigation channel for vessels entering Hau River Project, Package 6A and 6B | (6x2x0.23)m | 156.000 | 2015 |